Change Orders for Custom Woodwork and What to Charge
I quoted a walnut dining table at 2,350 dollars in February and delivered it in April for 2,350 dollars, after the client asked for it four inches longer, then for breadboard ends, then for a darker finish once she saw the first sample on...

I quoted a walnut dining table at 2,350 dollars in February and delivered it in April for 2,350 dollars, after the client asked for it four inches longer, then for breadboard ends, then for a darker finish once she saw the first sample on a Tuesday evening. Every one of those requests was reasonable. Together they cost me eleven extra hours and about 140 dollars of lumber, which came out of my own pocket because I had nothing on paper that said otherwise. The table is lovely. I lost roughly three days of shop time on it.
What finally fixed this for me was not a better quote. It was a half page document I now send whenever a client asks for something different from what we agreed, and the habit of sending it before I cut anything. It is not a legal instrument and I have never had to lean on it in any formal sense. It works because it makes the cost of a change visible at the moment the change is requested, rather than at the moment I hand over the invoice.
The three changes that actually cost money
Clients worry about the wrong requests. Someone will apologize for asking me to move a stretcher half an inch and then casually ask for a different wood, which is the far more expensive sentence.
Dimension changes cost money when they cross a material boundary. Making a table two inches wider is often free, because the glue-up was already going to use four boards. Making it five inches wider means a fifth board, a longer glue-up, more clamps than I own, and a top that no longer fits through my shop door at an angle. Last year a 6 inch width increase on a bench turned into 95 dollars of white oak and a trip to a friend's shop to use his wider planer.
Species changes reprice the entire job. Walnut sat around 12 to 14 dollars a board foot at my supplier through most of this year, soft maple around 5. Swapping a maple project to walnut on a piece using 20 board feet adds 150 dollars of material before I touch the labor, and walnut tearout on figured stock adds sanding hours nobody budgeted.
Joinery and finish changes are the quiet ones. Breadboard ends on a table top are not a detail, they are four hours of tenon and mortise work plus elongated pin holes if you want the top to move seasonally. A switch from oil to a sprayed conversion varnish means I am renting time in somebody else's booth, because my garage in October is 48 degrees and nothing cures properly.
What goes on the change order
Mine is one page and takes four minutes to fill in. The content matters more than the format.
- What was agreed, in one sentence, with the date of the original quote.
- What is now requested, in the client's own words if possible, because paraphrasing is how disputes start.
- The added material cost, with the board foot figure and the price per board foot written out, not folded into a total.
- The added hours at your shop rate. Mine is 45 dollars an hour, which is low for the region and something I will raise in January.
- The new delivery date. This is the line that changes behavior more than any dollar figure.
- A note on whether the change is reversible. Anything after a glue-up usually is not, and the client should know that before they decide.
- A signature line, or in practice a reply saying yes. An email saying yes is a signature.
I send it as a PDF because a PDF reads as considered and a text message reads as negotiable. The same logic sits behind the argument in why custom orders need a deposit first, which is the other document that pays for itself.
The advice I stopped following
Every craft business guide I read in my first two years said to absorb small changes for goodwill, because a happy client refers three more. I followed that and it nearly killed the side of the business that made money.
Run the arithmetic on a single year. I took twelve commissions in 2024 and absorbed an average of about four and a half hours of unbilled change work on each. That is 54 hours, which at my rate is 2,430 dollars, which was most of my profit for the year. The goodwill was real and I did get referrals, though the referrals arrived asking for the same discounted flexibility, because that is what my previous clients described.
What I do now is distinguish between a correction and a change. If I misread the drawing, that is mine and I eat it without comment. If the client wants something different from what we agreed, that is a change and it gets priced, even at 40 dollars. The small priced changes are the important ones. A client who has paid 40 dollars for a half inch adjustment thinks carefully before requesting the next one, and that thinking is worth more to both of us than my silent absorption of the cost. There is a longer version of this reasoning in pricing handmade work so it actually pays.
Pricing a change by how far along you are
A request is not worth the same amount at every stage, and clients accept this readily once you explain why. Before I buy lumber, most changes cost only the redraw, so I charge nothing under an hour of drafting. After lumber is milled to rough dimension, the material is committed and a dimension change usually means new stock, so the full material cost applies. After a glue-up, I price the change as a partial rebuild, because that is what it is.
The honest part of this conversation is admitting where the line sits. On a case piece I can often swap a door style after the carcass is together. On a chair, almost nothing is adjustable after the joinery is cut, because every angle depends on every other angle. I tell clients which of the two their project resembles in the first conversation, and I write the stage deadlines into the quote: changes free until March 14, material cost after, rebuild pricing after April 2.
Saying no without losing the job
Some requests should be refused. A client once asked for a 96 inch dining table in 3/4 inch thick cherry with no apron and no center support, because she had seen one in a photograph. That table would have sagged within a year and the photograph almost certainly showed a thicker top or a steel frame underneath.
The script that works for me is short. I explain what will physically happen, I offer the nearest thing I can build and stand behind, and I put a number on both. People hire a maker partly to be told this. I have lost one commission in four years to a refusal, and I have lost several days to pieces I agreed to build against my own judgment. The rest of the money side of this work sits in craft business.
FAQ
How much should a minimum change order be?
Mine is 40 dollars, which roughly covers the drafting, the email, and the interruption to whatever I was doing. Some makers set it at an hour of shop rate. The number matters less than having one, because a free change is an invitation to the next one.
What if the client refuses to sign a change order?
Then the original agreement stands and you build what was quoted. Say that plainly and without heat. In my experience the refusal is almost always about surprise at the cost, and it resolves once the material figures are visible on the page.
Do I need a lawyer to write one?
No. For work in the low thousands, a clear one page document describing what changed and what it costs does the job. If you are building kitchens or taking contracts above roughly 25,000 dollars, get proper advice, because at that size the terms around delay and acceptance matter more than the change pricing.
Should the deposit cover change work?
No, keep them separate. The deposit secures the slot and the lumber. Changes get invoiced as they happen, which keeps the client aware of the running total instead of meeting it at delivery.
More in Craft Business
Craft Business
What Teaching a Weekend Craft Class Actually Pays
I started teaching joinery on Saturdays because a side table was taking me fourteen hours and selling for $340.
Craft Business
Craft Business Bookkeeping With One Simple Spreadsheet
You sold forty pieces at the spring fair, a dozen more online, and somehow you cannot say whether the year made money.
Craft Business
Etsy Seller Fees and How to Price Handmade Work Around Them
You sell a $40 tote bag on Etsy, the payout lands, and it is closer to $35.